WeduTech · Savings Calculator
What the XGrind saves in your workshop.
Enter the size of your operation and see instantly how much working time and cost the automated TIG electrode grinding machine saves compared to grinding by hand.
Wage including ancillary labour costs.
Value of the time freed up when it is used for other productive work.
Show assumptions & calculation
- Electrodes/year = welders × electrodes/day × working days
- Manual grinding time: 96 sec./electrode double-sided or 48 sec./electrode single-sided (from field measurements, single-sided taken as half the value from experience)
- XGrind time required = electrodes/year × 12 sec. loading/unloading time (the grinding process itself runs automatically without tying up staff — independent of single- or double-sided grinding)
- Saving = hours freed up × hourly cost
All values in this calculation are deliberately conservative — the benefits below come on top and are not included here.
All figures are guide values based on our practical time measurements and serve as a first orientation. Individual results may vary depending on the operation.
- ✓Only 1 operator needed — all other welders are completely freed from grinding work
- ✓Reproducible grinding angle for a more stable arc
- ✓Less rework on the weld seam
- ✓Lower electrode consumption thanks to defined material removal
- ✓Reduced dust exposure for your staff
- ✓Automatic grinding wheel feed — no manual readjustment